2024.03 |
Acquired Computer Based Interlocking SIL4 certification - Generic Application |
2023.09 |
Acquired Computer Based Interlocking SIL4 certification - Safety Input/Output System (SIOS) |
2022.12 |
Completed development of long-distance track circuit system |
2022.11 |
Approval of completion of field test installation of ATP system (Korea National Railway Formerly Korea Rail Network Authority) |
2022.09 |
Acquired ISO 45001 certification |
2021.07 |
ATP system KORAIL safety product certification |
2020.09 |
Acquired CE certification (rectifier, AF track circuit system) |
2020.06 |
Development of IP-based electronic interlocking system |
2019.03 |
Electronic interlocking system railway product type approval and manufacturer approval certification |
2019.01 |
AF track circuit system speed code transmission type railway product type approval and manufacturer approval certification |
2018.06 |
AF track circuit system speed code non-transmission type railway product type approval and manufacturer approval certification |
2017.11 |
Automatic block control system railway product type approval and manufacturer approval certification |
2017.11 |
Development of electronic interlocking system for Indonesia |
2014.12 |
Development of electronic interlocking system for South Africa |
2014.04 |
Block signal development - Dual system development |
2014.01 |
Axle Counter Development |
2013.08 |
Development of a distributed electronic interlocking system that can be used for railways that run simultaneously with subway and KTX trains |
2012.05 |
Development of Automatic Block System – 1) Dual System 2) Digital single system |
2011.03 |
Audio frequency system development – Coding communication method |
2010.08 |
Development of audio frequency (AF) track circuit system for Seoul Metro Line 6 (Small and Medium Business Administration New Product Development Project) |
2008.09 |
Acquired CE certification (Surge Protect Transformer) |
2008.06 |
Development of input/output modules for electronic interlocking systems that do not use relays (Small and Medium Business Clean Product Development Project) |
2008.02 |
Acquired CE certification (Switch Mode Power Supply) |
2006.03 |
Development of non-insulated AF track circuit system in station area (Small and medium business clean product development project) |
2002.02 |
Acquired ISO 9001, 14001 certification |
2000.09 |
Technical partnership with Adtranz (now Bombardier) in the UK – domestic technology transfer of Af track circuit system |
1995.08 |
Electronic interlocking system development and domestic manufacturing and installation |