| 2024.03 | 
							Acquired Computer Based Interlocking SIL4 certification - Generic Application | 
						
						
							| 2023.09 | 
							Acquired Computer Based Interlocking SIL4 certification - Safety Input/Output System (SIOS) | 
						
						
							| 2022.12 | 
							Completed development of long-distance track circuit system | 
						
						
							| 2022.11 | 
							Approval of completion of field test installation of ATP system (Korea National Railway Formerly Korea Rail Network Authority) | 
						
						
							| 2022.09 | 
							Acquired ISO 45001 certification | 
						
						
							| 2021.07 | 
							ATP system KORAIL safety product certification | 
						
						
							| 2020.09 | 
							Acquired CE certification (rectifier, AF track circuit system) | 
						
						
							| 2020.06 | 
							Development of IP-based electronic interlocking system | 
						
						
							| 2019.03 | 
							Electronic interlocking system railway product type approval and manufacturer approval certification | 
						
						
							| 2019.01 | 
							AF track circuit system speed code transmission type railway product type approval and manufacturer approval certification | 
						
						
							| 2018.06 | 
							AF track circuit system speed code non-transmission type railway product type approval and manufacturer approval certification | 
						
						
							| 2017.11 | 
							Automatic block control system railway product type approval and manufacturer approval certification | 
						
						
							| 2017.11 | 
							Development of electronic interlocking system for Indonesia | 
						
						
							| 2014.12 | 
							Development of electronic interlocking system for South Africa | 
						
						
							| 2014.04 | 
							Block signal development - Dual system development | 
						
						
							| 2014.01 | 
							Axle Counter Development | 
						
						
							| 2013.08 | 
							Development of a distributed electronic interlocking system that can be used for railways that run simultaneously with subway and KTX trains | 
						
						
							| 2012.05 | 
							Development of Automatic Block System – 1) Dual System 2) Digital single system | 
						
						
							| 2011.03 | 
							Audio frequency system development – Coding communication method | 
						
						
							| 2010.08 | 
							Development of audio frequency (AF) track circuit system for Seoul Metro Line 6 (Small and Medium Business Administration New Product Development Project) | 
						
						
							| 2008.09 | 
							Acquired CE certification (Surge Protect Transformer) | 
						
						
							| 2008.06 | 
							Development of input/output modules for electronic interlocking systems that do not use relays (Small and Medium Business Clean Product Development Project) | 
						
						
							| 2008.02 | 
							Acquired CE certification (Switch Mode Power Supply) | 
						
						
							| 2006.03 | 
							Development of non-insulated AF track circuit system in station area (Small and medium business clean product development project) | 
						
						
							| 2002.02 | 
							Acquired ISO 9001, 14001 certification | 
						
						
							| 2000.09 | 
							Technical partnership with Adtranz (now Bombardier) in the UK – domestic technology transfer of Af track circuit system | 
						
						
							| 1995.08 | 
							Electronic interlocking system development and domestic manufacturing and installation |